|
![]() |
![]() |
|
| Production processes | Organisation processes | |
![]() |
![]() |
![]() |
| Communication processes | Logistic processes | Courses |
AQM International Consulting bv (further on AQM) has already a long history on work study, but convert also with processes into flow production, with or without takt. In automotive, metal-electro, aerospace and logistics, at home and abroad.
Kaizen, Gemba, Lean, TQM fits perfectly with the standard time method of MTM (Methods Time Measurement, has been based on predetermined times). MTM’s large advantage is that costs can be avoided during the development of new products. Largest power lies in the attention on the method, the standard time is a reliable derivative of it; including performance index.
AQM works with attention to the employee. That happens already during the analysis phase. The result is presented in a visual manner. The possibilities are made in a simple way visible, so also the employees can mean a large role in the implementation of the chosen project solution. Within this lies the strength of AQM..
| • | Method, process- and work analysis (i.e. multi moment records, time study |
| • | Workshop continue improvement on shert term, together with several disciplines |
| • | Analyzing processes, make it visually and convert it to an optimal process flow |
| • | Quality, working condition and environment implentation and audits |
| Implentation of Method Time Measurement (MTM): 5 - 15% economy | |
| Production output increase up to 80% | |
| Introduction of new cost price calculation techniques and simplifications | |
| Optimized work spots, for more work satisfaction and increasing output |
| • | Making of capacity and planning summaries for existing and new products |
| • | Cost price calculation set-up, development and cost control |
| • | Support of investment projects |
| • | Record of tasks and activities together with and for employee |
![]() |
Reconstruction of test departments (economy of 4 workers) |
![]() |
Development of a repeat order system (higher quality and fix norm times (minus 1 worker) |
![]() |
Introduction of a more effective quotation flow for shorter lead times |
![]() |
Expand cost price calculation department to an industrial engineering department |
![]() |
Integration of pre-calculation and process planning to one department and team |
![]() |
Introduction of improved capacity planning, based on new tooling |
| • | Implementation, development and report of management information |
| • | policy support for the departments sales, production, planning and management |
| • | creating a future shop concep |
![]() |
Production- and information process introduced in Czech plants |
![]() |
Reconstruction of the suggestion box for a fast and effective treatment |
![]() |
Introduction and implementation of a worker condition plan |
| • | Introducing of a new and different logistics concept |
| • | optimization of the goods flow |
| • | company customer made courses and support |
![]() |
Development, together with MTM Germany, of a logistics course |
![]() |
Improved lead times on basis of logistical investigations |
![]() |
incoming and outgoing goods flow and lay-out adjusted to more volume |
MTM-1 (Methods Time Measurement)
Time -method for mass production
SD (Standard Data)
Time method for half series production
UAS (Universal Analyses System)
Time method for series production
MEK (MTM for a few pieces and small series)
Time method for few piece and small series production.
MEK Logistics
Time method for forklifts, haulers f.e., and packing and unpacking.


Menu






